October 13, 2026
How to document leakage for a REDD+ monitoring report

Leakage is the part of a REDD+ monitoring report that trips up more project developers than the carbon stock numbers do. You can have clean plot data and a defensible emission factor and still get a corrective action request because the leakage belt analysis reads like an afterthought. Here's how the documentation needs to come together, before your verifier starts asking the questions you should have answered in the report.
What a verifier is actually checking
The leakage section exists to answer one question: did protecting this project area just push the deforestation pressure somewhere else. Verification bodies working under VCS methodologies (VM0007, VM0015, and the REDD+ module stack built on them) expect three things to be traceable in the monitoring report, each with dated evidence behind it, not a narrative paragraph asserting they happened.
First, a defined leakage belt or leakage management area, drawn and justified in the PDD and re-confirmed at monitoring. Second, activity-shifting leakage: evidence that the agents displaced from your project boundary did not simply relocate their clearing or logging into that belt. Third, where the methodology calls for it, market leakage accounted for through the standard deduction rather than measured in the field, since that part is a calculation, not a site observation.
Most project developers handle the belt boundary fine and fall short on the second item. A verifier wants to see monitoring-period evidence for the belt that parallels what you're already producing for the project area: a loss layer, a date, a comparison to the baseline rate. If your main monitoring report has dated change detection for the project boundary and the leakage section has a one-time qualitative risk statement carried over from the PDD, that gap is where the CAR comes from.
Building the activity displacement evidence
The displacement question comes down to a before-and-after comparison inside the leakage belt, run on the same schedule as your main monitoring. In practice that means:
- A defined leakage belt polygon, consistent across vintages, with the same coordinate reference and rationale used at validation.
- A dated loss layer for the belt covering the monitoring period, produced the same way each year so a VVB can compare vintage to vintage without reconciling two different methods.
- A rate comparison against the baseline deforestation rate for that belt, since the methodology asks you to show the observed rate falls within or below what was already projected.
- A short note on what's driving any clearing you do find. Agricultural expansion unrelated to displaced project agents is a different finding than a logging crew that used to work inside your boundary now working the belt instead.
None of this needs to be elaborate. It needs to be dated, repeatable, and sitting in the same monitoring report as your project-area change detection. Teams that leave it as a separate exhibit, assembled the week submissions are due, are the ones who end up explaining gaps to a VVB instead of closing them in advance.
Where this goes in the report
A monitoring report that treats leakage as its own evidenced section, belt mapped, loss layer dated, rate comparison shown, reads very differently to a VVB than one where leakage is three sentences ahead of the uncertainty discussion. The first tends to get accepted on first pass. The second gets a request for additional information, which costs you a verification cycle you didn't budget for.
If you're already pulling annual VHR change detection for your project boundary, extending the same comparison to the leakage belt is a smaller lift than most teams assume, since the imagery and the method are already in hand. Carbon Project MRV builds that dated monitoring record, project boundary and leakage belt together, into the dossier your verifier actually reads.
Start your next monitoring cycle with the leakage evidence already built instead of assembled the week before submission.